Posts from: 2010
- Railway Open Day, Sunday 24 October 2010 10/11/2010
- Lots to see and do on our Open Day: Read more >>
- Presidents Annual Report 2009-2010 available 21/09/2010
- Download the report here: Read more >>
- Goldfest Train Rides 15/09/2010
- Goldfields Railway is providing train trips over each Monday
of the School holidays, coinciding with Goldfest
celebrations. Read more >>
- Goldfields Railway is operating again 02/09/2010
- After a break for track repairs, our Railway is operating
again, from Friday to Monday inclusive till the summer
season. Read more >>
- Notice Of Annual General Meeting - 2010 31/08/2010
- All are welcome to attend the Goldfields Railway Inc. Annual
General Meeting on Saturday, 18th September 2010 at 7pm in
the Waihi Arts Centre & Museum, 54 Kenny Street, Waihi. Read more >>
- Track due to re-open September 3rd 30/08/2010
- Following track reconstruction, passenger services will
resume on Friday 3rd September 2010. We will be operating
on our winter timetable - Friday, Saturday, Sunday and
Monday: Read more >>
- Goldfields Website gets a makeover 06/08/2010
- We have put together a new format website. Read more >>
- Goldfields Railway Suspends operations for major re-construction work 30/07/2010
- Due to a major re-construction of railway infrastructure,
rail services by Goldfields Railway will be suspended from
20 July till Further notice, expected to be a month or so.
The time services are suspended will depend on weather and
availability of volunteer staff to carry out this major
work. We are working to make sure your railway is preserved
for future generations. Read more >>