Track due to re-open September 3rd

Posted on 30/08/2010 by Admin

Following track reconstruction, passenger services will resume on Friday 3rd September 2010.  We will be operating on our winter timetable - Friday, Saturday, Sunday and Monday:

From Waihi: 10.00am, 11.45am, 1.45 pm
From Waikino: 11.00am, 1.00pm, 2.30 pm

 
 

Design: Lumina Web Solutions Ltd.