August closure no longer required

Published about 2 years ago by Admin in Track Maintenance

A scheduled shut down for maintenance in August is no longer required as works were able to be completed during the extended close down for the bridge construction.

The timetable will be as per normal however, if on days there is poor weather conditions and no passengers, we may elect to not run the train – please ring the station if the weather is poor to confirm if the train is running.